Public Deliverables

D1.9 - 2nd Community Periodic Contribution

A report on the distribution of the European Union financial contribution between beneficiaries (see Article II.4.3 of the Grant Agreement) must be submitted 60 days after receipt of the final payment (not required for intermediate payments). Nevertheless, spOt DOW plans a yearly update. Télécharger le document

Public Deliverables
Download

D1.8 - 2nd Management Periodic Report

The following pages are describing all the expenses incurred during spOt project 2nd period and provide a justification. These expenses are listed in the following tables (one table by participant). Télécharger le document

Public Deliverables
Download

D3.2 - Standard cell lib. Representing various design corners in the design environment

In order to explore the opportunities of SOT-based memories at architectural level, a library of primary SOT-based logic and memory elements should be developed and characterized. Synthesis tools such as Synopsis Design Compiler can then utilize the resulting libraries to synthesize higher level design descriptions into the logic and memory cells included in the library file. The .lib file format is used to represent the timing and power characteristics of each library cell in the ASCII format. The timing and power values are obtained by simulating each cell under various conditions. In this report, the design and characterization procedure of SOT-based cells in the scope of the SpOt project (D3) is detailed. As a case study, the design and structure of a Non-Volatile Flip-Flop (NVFF) is presented. Télécharger le document

Public Deliverables
Download

D1.5 - 1st Community Periodic Contribution

A report on the distribution of the European Union financial contribution between beneficiaries (see Article II.4.3 of the Grant Agreement) must be submitted 60 days after receipt of the final payment (not required for intermediate payments). Nevertheless, spOt DOW plans a yearly update. Télécharger le document

Public Deliverables
Download

D1.4 - 1st Management Periodic Report

The following pages are describing all the expenses incurred during spOt project 1st period and provide a justification. These expenses are listed in the following tables (one table by participant). Télécharger le document

Public Deliverables
Download

Formulaire de filtrage

spin Orbit torque memory for cache & multicore processor applications

Private space